Selective licensing in England: when a rented home needs a council licence

Selective licensing lets a council require a licence for every privately rented home in a designated area, not just HMOs. If your let is inside a scheme, you need a licence before you let it, and letting without one can mean a civil penalty of up to £40,000 or up to two years' rent repaid.

Registration Last checked England

What selective licensing is

Selective licensing comes from Part 3 of the Housing Act 2004. A council designates an area, and from the date the scheme starts every privately rented home in it needs a licence from the council. That includes a family house, a flat let to a couple and a small house share, not only HMOs.

  • It only applies inside a designated area. Two streets apart, the rules can differ.
  • A scheme lasts up to five years. The council can make a new one when it ends.
  • A licence lasts up to five years and covers one property.
  • The licence holder must keep to the mandatory conditions and any the council adds.
  • Letting without a licence you need is a criminal offence.
LicenceWhat it coversWhere
Mandatory HMO licence5 or more people from 2 or more households sharing facilitiesAll of England
Additional HMO licenceSmaller HMOs the council chooses to licenseDesignated areas
Selective licenceAny other privately rented homeDesignated areas

Check a property

Enter a postcode and LetRecord finds the council and shows whether a reviewed selective licensing record applies to that address.

How to tell if your property is in a scheme

Only your council can tell you for certain. Look on its website for a selective licensing page with a map or street list, and check the start and end dates of the designation. Schemes range from a handful of streets to most of a borough, and a council can run several at once with different dates.

Since 23 December 2024 councils in England no longer need the Secretary of State to confirm a scheme, whatever its size. They still have to consult the people likely to be affected, and government guidance expects that consultation to run for at least 10 weeks. Watch your council's consultations: a scheme that is only proposed today can cover your street next year.

A council can designate an area for low housing demand or significant and persistent anti-social behaviour. Where a large share of homes are privately rented, it can also rely on poor property conditions, high migration, high deprivation or high crime.

To see whether a home already has a licence, look it up on our selective licence register, built from the registers councils publish. A missing entry doesn't prove the home is unlicensed, because many councils don't publish their register online.

Lets that don't need a selective licence

Part 3 and the Selective Licensing of Houses (Specified Exemptions) (England) Order 2006 leave out some homes, even inside a scheme:

  • homes let by a housing association or other registered provider of social housing;
  • HMOs that need a mandatory or additional HMO licence instead;
  • homes with a temporary exemption notice or a management order in force;
  • homes under a prohibition order that is in force;
  • business tenancies, licensed premises and agricultural tenancies that can't be assured tenancies;
  • homes managed or controlled by a council, police, fire and rescue or NHS body;
  • long leases of over 21 years with no break clause for the landlord;
  • lets to a family member who lives there as their only or main home, where you own the freehold or a lease of over 21 years;
  • holiday lets;
  • lodgers who share a kitchen, bathroom, toilet or living room with you or your family;
  • some student buildings that are excluded from the HMO rules.

A small HMO is the case people get wrong most. If your council has a selective scheme but no additional HMO licensing, a three-person house share below the mandatory threshold still needs a selective licence.

Who holds the licence

The council grants the licence to the person it decides is most appropriate, usually the landlord and sometimes a managing agent. Before it grants a licence the council must be satisfied that:

  • the proposed licence holder is a fit and proper person;
  • no banning order is in force against the landlord;
  • the manager, if there is one, is fit and proper and is the person in control or their agent;
  • the management arrangements are otherwise satisfactory.

Previous housing offences, fraud, violence or a history of breaking landlord law can count against you, so answer the declarations fully and accurately.

Licence conditions

Schedule 4 of the Housing Act 2004 sets conditions that every selective licence must include. The licence holder has to:

  • give the council a gas safety certificate every year if there is gas;
  • keep electrical appliances and furniture you provide safe, and give a declaration about them when the council asks;
  • make sure every electrical installation is safe, and give a declaration when asked;
  • fit a smoke alarm on each storey used as living accommodation, keep it working, and give a declaration when asked;
  • fit a carbon monoxide alarm in any room with a fixed combustion appliance other than a gas cooker;
  • give the occupiers a written statement of the terms they live there on;
  • ask for references from people who want to live there.

Councils add their own conditions on top, such as dealing with anti-social behaviour, waste storage, repairs and allowing inspections. Read the draft licence when it arrives: you can make representations before it is final.

The national minimum bedroom sizes apply to HMO licences, not to selective licences. The council can still act on overcrowding or hazards under its other powers.

How to apply

Apply to the council for the area, usually online. Each council sets its own fee and form. Most ask for:

  • the property address and the number of households and occupants;
  • proof that you own it or have authority to let it;
  • details of the proposed licence holder and any manager, with fit and proper declarations;
  • the current gas safety record, EICR and EPC;
  • anyone else with an interest in the property, such as a mortgage lender or freeholder.

Once you have made a valid application, you aren't committing the offence of letting without a licence while the council decides it. Keep the confirmation and the payment receipt.

If you're about to stop letting, sell, or move back in, ask the council for a temporary exemption notice. It lasts three months. The council can serve a second one only in exceptional circumstances, and you can appeal a refusal to the tribunal within 28 days.

Penalties for letting without a licence

Letting a home that needs a selective licence without one, or breaking a licence condition, can lead to:

  • prosecution, with an unlimited fine for letting without a licence;
  • a civil penalty from the council of up to £40,000 instead of prosecution, for conduct from 1 May 2026 (up to £30,000 before then);
  • a rent repayment order of up to two years' rent for the time the home was unlicensed.

Since 1 May 2026 the offence also reaches landlords higher up the chain. If you let to a company that sublets, you can be liable too unless you can show you didn't know and had no reason to know, took all reasonable steps to get the home licensed, or had another reasonable excuse.

Selective licensing and the PRS database

From 15 December 2026, every landlord in England must register themselves and each rental property on the private rented sector database. A selective licence doesn't replace that registration, and registering doesn't replace a licence. Our PRS database registration guide lists the opening dates by region.

How LetRecord helps

When you add a property, LetRecord looks up its council and shows a selective licence row where we hold a reviewed record of the council's scheme. Upload the licence and we track its expiry alongside the gas record, EICR and alarm checks the licence conditions depend on, so the evidence is in one place when the council asks for it.

Common questions

Do I need a selective licence for a single flat?

Yes, if it is privately rented and inside a selective licensing area, unless one of the exemptions applies. Selective licensing covers single-household lets, not only HMOs.

Do I need a selective licence and an HMO licence?

No. An HMO that needs a mandatory or additional HMO licence is outside selective licensing. A smaller HMO that doesn't need an HMO licence still needs a selective licence if it is in a scheme.

How long does a selective licence last?

Up to five years from when it is granted. Check the expiry date on the licence, and apply again if the council makes a new scheme.

Can I keep letting while my application is decided?

Yes. Once you have made a valid application to the council, you aren't committing the offence of letting without a licence while it is decided.

What is the fine for not having a selective licence?

Prosecution can bring an unlimited fine. The council can instead issue a civil penalty of up to £40,000 for conduct from 1 May 2026, and tenants can claim up to two years' rent back through a rent repayment order.

Does a lodger in my home count?

No. If your lodger shares a kitchen, bathroom, toilet or living room with you or your family, the let is exempt.

Does the council need government approval for a scheme?

Not since 23 December 2024. Councils in England can make a scheme of any size without the Secretary of State's confirmation, but they must consult first.

Official sources

This guide explains the rules in general terms and is not legal advice.

See what applies to your property

Enter a postcode to see the EPC ratings, the PRS registration window and planning constraints around it. Free, no account needed.

Free PRS registration checklist

Not ready to sign up? Get the step-by-step checklist for registering on the private rented sector database, with the dates for every region.

We only use your email to send what you ask for. See our privacy policy.

More guides